Government of India’s assistance to Bhutan

8th Plan Important Projects (1997-2002)


GOI contribution: Rs. 10500 million

Indian contribution to Bhutan’s 8th Five Year Plan (1997-2002) is Rs 10500 million, comprising Rs 4000 million as development subsidy and Rs 6500 million as project-tied assistance.

Mega projects like the Tala hydroelectric project, the Kurichu hydroelectric project and the Dungsam Cement, with the combined assistance of about Rs 16250 million in 8th Five Years Plan, in the form of grants and loans, (Tala-Rs 10000 million, Kurichu-Rs 5250 million and Dungsam-Rs1000 million) are outside India’s planned assistance.
In essence, total GOI assistance to Bhutan in the 8th Five Year Plan would actually amount to Rs. 77000 million.

Some important projects taken up during the 8th Five Year Plan are: 

  • Pasakha-Manitar By-pass Road

    Location: 38.9 km of road on Thimphu-Phuentsholing highway connecting Pasakha near Phuentsholing to Manitar near Gedu
    Funded by GOI at a revised cost of Rs 754 million (estimated)


    The Pasakha-Manitar by-pass road project has been undertaken to avoid the recurring landslide zone at the most vulnerable portions at Takti and Sorchen on the Thimphu-Phuentsholing highway, which links Bhutan with the State of West Bengal on the Indian side. The highway is the most important link with India and facilitates in a major way the movement of goods and services between the two countries.  Government of India approved the project at an estimated cost of Rs 754 million  (including Phase I & II). Project Dantak started the work in September/October, 1999. The project has resumed in the 9th plan at a revised cost.

  • Punakha Dzong Renovation

    Location : Punakha district
    Funded by GOI at a cost of Rs 228.5 million


    Punakha Dzong (Fortress) built by the first Dharma Raja of Bhutan in the 17th century, is the seat of the monastic body during winter months. Renovation of the Dzong and Talo Lhakhang (temple) started in early 1980’s. India’s commitment to this project is Rs 228.5 million out of the estimated cost of Rs 347.905 million. The Dzong was inaugurated in May 2003 by His Holiness the Je Khenpo in the presence of His Majesty the King, Their Majesties the Queens, Royal family members, cabinet Ministers, Indian Ambassador Shri K.S Jasrotia and other dignitaries. Je Khenpo thanked GOI for our assistance in the renovation of the Dzong.

  • Rehabilitation of Educational Infrastructure

    Location : Throughout Bhutan
    Funded by GOI at a cost of Rs 200 million


     
    Activities undertaken under this project include renovation/construction of classrooms, hostels, staff quarters, science laboratory, library and electrification works at 28 Junior High Schools/High Schools.  All works have been completed.  

  • Eastern Grid Transmission line

    Location : Eastern Bhutan
    Funded by GOI at a cost of Rs 1276 million

    Project to evacuate the power generated by the Kurichu Hydroelectric Project.  It consists of construction of 132/33 KV & 33/11 KV substations at Deothang, Nangkor, Kanglung, Kilikhar, Tintibi & Nanglam and works on the existing 132 KV substation at Geylegphug and associated infrastructure works.  Single Circuit 132 KV Transmission Line of about 72 km is to be constructed as follows :

    (a) Gyelpozhing-Kilikhar-Kanglung - 46 km
    (b) Nangkor-Deothang - 26 km

    M/s WAPCOS (India) Ltd. are consultants for the project.  The revised estimated cost of the project, funded by GOI, is Rs 1276 million.  The Project was inaugurated in June 2003 ensuring supply of power to seven eastern and southern Dzongkhags (districts) from Kurichhu Hydroelectric project.  

  • JDWNR Hospital - a 350-bed hospital

    Location: Thimphu
    Funded by GOI at a cost of Rs 180.83 million


    Initially, a project was conceived to upgrade the 175-bed Jigme Dorji Wangchuck Hospital to a national referral hospital at the cost of Rs.87 million.  Later however, it was felt that the existing structure was too weak to upgrade. It was, therefore, proposed to build a new 350-bed hospital at a revised cost of Rs  180.83 million. The released amount has been utilized towards the construction of filter clinic, lab building, compound wall, gift shop, doctors and nurses quarter and internal road. 

    Construction of the main hospital complex is yet to begin. The consultancy work has been awarded to M/s Apollo Hospitals Group.   The total cost of the project has gone up to Rs 870 million, including the amount already spent. Work is expected to begin shortly after the signing of MoU between the two countries.  

  • Regional Referral Hospital

    Location: Mongar
    Funded by GOI at a cost of Rs 90.837 million


    The project was initially conceived during the 7th Plan for remodeling and upgrading the existing Hospital in Mongar to a 100-bed.  India’s revised commitment is to fund a 150-bedded hospital at the cost of Rs 90.837 million.  The scope of the project included staff quarters, furnishing basic equipment and other essentials like electric sub-station, internal road network, water supply, landscaping and generator set. Location of the hospital in Mongar provides easy access to the people of seven districts in the eastern region. 

    Rs 75 million released during the 7th & 8th Five Year Plans was utilised for staff quarters, part of internal compound fencing of the hospital complex and preliminary preparation of the site for the hospital. The consultants of the hospital are M/s Apollo Hospitals Ltd. The completion of the new hospital will spill over to the 9th Plan.  The revised cost of the project has gone up to Rs 514 million, including the fund already utilised.

Sector-wise allocation in GOI Aided Projects in 8th Plan 
(Fig. In Million Rupees)

S.N.

PROJECT/ACTIVITY 8th Plan Allocation Reprioritized allocation


1.
2.
CULTURE

Punakha Dzong
Fire Fighting Equipment for Dzong


228.500
   63.500


228.500
40.000

Sub Total   292.000   268.50


3.
4.
5.
6.

EDUCATION

Rehabilitation of Edn. Infrastructure
Sherubtse College Upgradation
NIE Samtse
Approach Road to T/Yangtse School



366.100
22.600
11.292
0.000



200.549
22.600
10.743
14.943


Sub Total   399.992 248.835


7.
8.

9.
10.
11.
12.
13.



14.


15.


16.

POWER
Power Transmission Eastern Grid
Power STD Phase II (Thimphu & Paro)
Mini Hydels-Chennary
Mini Hydels-Lhuntshi
Mini Hydel-Wangdi
Mini Hydel-Gidakom
Mini Hydels-Others
a) Mini Hydels-Khaling
b) Mini Hydels-Khalanzi
c) Mini Hydels-Chhumey
Kurichu-Lhuntshi Transmission Line  ( Previously Lhuntshi Small HE Project)
Improvement & Upgradation of Transmission Grid

Rural Electrification Transmission Line



800.000

   395.280
    
17.040
       8.980
      
2.870
    
27.210

5.740
      
6.390

11.950
120.000

190.000


43.750


1276.237
  357.380

27.540
10.980
7.000
27.50

9.240
11.460
   21.450
  225.367

97.602

39.079


Sub Total 1,629.210 2,110.835



17.
18.
19.
20
21.

HEALTH

Mongar Hospital
Lhuntse Hospital
Tashiyangtse Hospital
JDWNRH Expansion
Malaria Control Programme

60.830
31.640
31.670
180.830

20.000



90.830
31.640
  36.670
  180.830
   16.000

  Sub Total    483.000 355.970
22.

URBAN DEVELOPMENT

Khuruthang Township Project
  
28.700
  
40.122
  Sub Total 28.700 40.122



23.

24.
25.
26.

27.

ROADS & BRIDGES

Pasakha-Manitar Highway
(Sorchen Bypass Road)
Construction of Three Bridges
Construction of Bhurchhu Bridge
Construction of Feeder Road at
Haa 
Construction of Bypass
Road at Deothang



350.000

63.000
36.000

34.000



543.160

105.000
36.795
34.000
12.244

  Sub Total 662.000 731.199


28.

SURVEY

Identified Co-op. Projects



16.000


18.500*
  Sub Total 16.000 18.500*


29.

JUDICIARY

Construction of High Court Building



  108.000
  

4.000
  Sub Total 108.000 4.000


30.
31.

TRADE & INDUSTRY

Gidakom Inudstrial Estate
Fire Ftg. Eqpt. For POL Depot, Deothang

   

7.000
    4.500

   

1.380
2.250

  Sub Total    11.500     3.630
32.

AGRICULTURE
Integrated Area Dev. Sub-Tropical Zone

    5.000     1.000
  Sub Total     5.000     1.000



33.

CIVIL AVIATION

Paro River Training Works



4.518



4.518

  Sub Total 4.518 4.518


34.

HRD

Scholarships



110.63


40.00
35. 7th plan projects and outside 8th plan agreed projects   228.776 228.776
  GRAND TOTAL   3,979.326 4,055.885

 

Previous Five Year Plans

Serious developmental efforts in Bhutan began in early 1960s when India started extending financial assistance. Seven Five-Year Plans of Bhutan have been completed, the first two of which were totally financed by India.
Plan-wise allocations made by the Royal Government, showing India's contribution therein, are as follows: -

  Total
Allocations  
India’s
Contribution
% of India’s
Contribution
1961-66 (1st Plan) 107.2 107.2 100%
1966-71 (2nd Plan) 202.2 202.2 100%
1971-76 (3rd Plan) 475.2 426.6 90%
1976-81 (4th Plan) 1,106.2 853.0 77%
1981-87 (5th Plan) 4,440.5 134.0 30.2%
1987-92 (6th Plan) 9,500.0 4,000.0 42.1%
1992-97 (7th Plan) 23,500.0 7,500.0 31.9%
1997-02 (8th Plan) 32,610.0 10,500.0 27.6%



Ninth Five Year Plan (2002-2007)


Two rounds of talks have been held between India and Bhutan to finalise GOI's commitment for Bhutan's 9th Five Year Plan. In the second round of Talks held in December 2002, GOI agreed to take up the following projects in Bhutan.
The estimated cost of the project to be taken up during the 9th Plan is about Rs./Nu. 7338 million.


Agreed List of Projects under Government of India Financing in Bhutan's 9 th Five Year Plan:

S.N. Projects Remarks
I.  Health Sector  
1.
Expansion & upgradation of JDWNR Hospital
Ongoing
2.
Expansion/upgradation of Mongar Hospital
Ongoing
3.
Malaria Control Programme
Ongoing
4.
Public Health Laboratory

II.
Education

1.
10 new  Schools at new sites
Ongoing
2.
Expansion of Sherubtse College
Ongoing
3.
Infrastructure for Inst. of lang. and culture
Ongoing
4.
Construction of Youth Centre
Ongoing
III.
Roads and Bridges Sector

1.
Gyelposhing-Ngalam Rd (25km + 3 bridges)

2.
Construction of 3 bridges
Completed
3.
Pasakha Manitar Road
Ongoing
4.
Chuzom - Paro Highway( Double laning)
Ongoing
5.
Babesa- Phuentsholing Highway(Double laning)

IV. Power  
1.
Feasibility Study of 2000 MWs HPP (Punatsanchu II, Deglia in Zemgang, Kholongchu in T/Yangtse)

2.
Power transmission - Eastern Grid
Completed
3.
Power STD - Phase II ( Thimphu-Paro)
Completed
4.
Kilikhar- Lhuentshe ( Transmission Line)
Ongoing
5.
Improvement of Transmission Grid
Completed
6.
Chennari Mini Hydel Project
Completed
7.
Integrated Energy Mgmt. Master Plan
Ongoing
8.
Deothang-Rangia Transm line Project
Ongoing
9.
Tintibi- Trongsa -Bhumthang Trans line

V. Trade and Industry  
1.
Essential Oils - Quality Control Lab

2.
IT Dev Prog

3.
Improvement of Fuel Quality

4.
Industrial Investment Studies

VI. Road Safety and Transport Authority  
1.
Preparation of Transport - Master Plan
Ongoing
2.
Procurement of Traffic Safety Equipment

VII. Civil Aviation  
1.
Rapid Intervention Vehicle
Ongoing
2.
Airport Fencing
Ongoing
3.
River Protection Works
Ongoing
4.
Resurfacing/Extension  of Paro Airfield

VIII. Culture  
1.
Admn Bldg for National Library

2.
Admn Bldg for RAPA

3.
Office /Exhibition Hall for National Museum
Ongoing
IX. Urban Development and Housing  
1.
Low Income Housing
Ongoing
2.
R&D on Construction Technology

3.
Construction of International Convention Centre, Secretariat Building, RCSC, etc., 

X. Judiciary  
1.
Construction of New High Court Building

XI. Media  
1.
Construction of TV Centre
Ongoing
XII. Human Resources Dev  
1.
Scholarships etc.,

XIII. Survey  
1.
Aerial Photography
Ongoing
2.
Geophysical Survey
Ongoing
XIV. Information Technology  
1.
Dzongkhag LAN and Internet connections
Ongoing
2.
Multipurpose Telecentres in 10 Dzongkhags
Ongoing
3.
Regulatory Framework
10th Plan
4.
Electronic Signatures
10th Plan
5.
Government Intranet

XV. Additional Projects  
1.
Telecom Cellular Phone project
Completed
.

top